Portal handling system with processing station
Manufacturing a portal handling system according to the client’s drawing as well as the central components for the processing station. The system was assembled in FMS’ facilities and pre-commissioned together with the client.
Major welding certificate required.
Usage: bars are introduced into the station, isolated there, automatically transported to the processing station, processed and prepared for collection on the other side.
Components for testing equipment
Welding
Mechanical engineering
Surface treatment
Precision assembly in the µm range at FMS’ facilities
Assembly at the end client’s facilities
For example, casing made of nickel-chromium steel 1.4571
Procurement of materials
Welding
Mechanical engineering
Surface treatment
Usage:separation of liquids